When remodeling a bathroom, the first step is to remove all of the fixtures and fittings from the room. This includes the toilet, bathtub, shower, sink, and all of the plumbing. Once everything is removed, you can start to lay out your design plans for the new bathroom.
The order in which you do things when remodeling a bathroom can make or break the project. Here's the best order to follow: 1) Fix any plumbing issues. Leaks and drips can damage your walls and flooring, so they need to be fixed before anything else. 2) Install new flooring. If your floor is damaged or outdated, installing new flooring should be your top priority. 3) Paint the walls and ceiling. Once the floors are in place, it's much easier to paint the walls and ceiling. 4) Install new cabinetry and countertops. These are usually the last things to go in, since they take the longest to install."
© 2025 HandsDown Copyright - All rights reserved