There is no one-size-fits-all answer to this question, as the frequency of resurfacing a parking lot will depend on a variety of factors, including the material used for the surface, the climate (hotter climates will require more frequent resurfacing), and traffic volume. However, it is generally recommended that a parking lot should be resurfaced every five to seven years.
It depends on the type of surface, weather conditions, and how heavily it is used. A general guideline is every 3 to 7 years.
© 2025 HandsDown Copyright - All rights reserved